Terrebonne Parish |
Code of Ordinances |
Appendix A. SUBDIVISION REGULATIONS |
Appendix 24.5. PROCEDURES |
Appendix 24.5.4. PROCESS C: MASTER PROPOSAL REQUIREMENTS |
§ 24.5.4.7. Process C: Approval of Preliminary Survey Plat:
In conjunction with the engineering application, a preliminary survey plat must be submitted. This plat shall depict the following information:
1.
Name of proposed subdivision;
2.
Name of developer;
3.
Dedication block for utility, drainage and street rights-of-way;
4.
Vicinity map;
5.
Date, text of legible letter size, scale (suggested one (1) inch equals two hundred (200) feet), north arrow;
6.
Proposed street names, lot and block numbers (including major streets);
7.
Alignment of existing streets, rights-of-way, easements, and servitudes which join or cross the proposed subdivision;
8.
Section, township and range, city limits and/or parish boundaries which abut or cross the proposed subdivision;
9.
Proposed location of at least one permanent benchmark for each block in the subdivision or street intersection in the subdivision; and
10.
Signature block for approval by commission.